Current Projects:
Kemmerer High School Addition & Remodel
Owner: Lincoln Count School District #1
General Contractor: Hogan Construction
Project Location: Kemmerer, WY
The Kemmerer High School project is a 2 phase addition and remodel of the existing High School. Project is fairly complex due to 2 new services and new distribution system. Phase 1 - the north side of the building was demolished and rebuilt with the center and south portions remaining occupied. Phase 2 - the south side of the existing building was demolished and the center and north sides were occupied to allow for construction of new south addition. Project includes electrical distribution, lighting and controls, fire alarm, intercom, data/communications, fiber optics, public address, access controls, and IP camera systems.
General Contractor: Hogan Construction
Project Location: Kemmerer, WY
The Kemmerer High School project is a 2 phase addition and remodel of the existing High School. Project is fairly complex due to 2 new services and new distribution system. Phase 1 - the north side of the building was demolished and rebuilt with the center and south portions remaining occupied. Phase 2 - the south side of the existing building was demolished and the center and north sides were occupied to allow for construction of new south addition. Project includes electrical distribution, lighting and controls, fire alarm, intercom, data/communications, fiber optics, public address, access controls, and IP camera systems.
Boulder Community Center
Owner: Town of Boulder
General Contractor: Fixter Construction
Project Location: Boulder, WY
The Boulder Community Center project is a a complete interior demolition and new interior with upgrades. Project includes a new electrical service and distribution system including a solar co-generation system. Project was able to be funded due to value engineering proposals to help save costs. The Boulder Community Center is a historical building and requires special considerations. Project includes electrical distribution with solar co-generation, lighting, fire alarm system, data/communications.
General Contractor: Fixter Construction
Project Location: Boulder, WY
The Boulder Community Center project is a a complete interior demolition and new interior with upgrades. Project includes a new electrical service and distribution system including a solar co-generation system. Project was able to be funded due to value engineering proposals to help save costs. The Boulder Community Center is a historical building and requires special considerations. Project includes electrical distribution with solar co-generation, lighting, fire alarm system, data/communications.
Completed Projects:
QEP Resources
Owner: QEP Resources
General Contractor: Fixter Construction
Project Location: Pinedale, WY
The QEP Resources project consisted of new construction of a new shop building, office building, and adjacent parking and storage lots. Project was completed in 2 phases with the shop building being completed first while the office building was still under construction. The buildings were very unique in their design and interior finishes. Electrical scope of the project included new electrical services, electrical distribution systems, lighting and control systems, site lighting, fire alarm system, tele/comm systems, UPS backup systems, access controls, and IP video systems.
General Contractor: Fixter Construction
Project Location: Pinedale, WY
The QEP Resources project consisted of new construction of a new shop building, office building, and adjacent parking and storage lots. Project was completed in 2 phases with the shop building being completed first while the office building was still under construction. The buildings were very unique in their design and interior finishes. Electrical scope of the project included new electrical services, electrical distribution systems, lighting and control systems, site lighting, fire alarm system, tele/comm systems, UPS backup systems, access controls, and IP video systems.
Town of Pinedale West Transmission Line
Owner: Town of Pinedale
General Contractor: Knife River
Project Location: Pinedale, WY
The West Transmission Line project extended the water lines coming from the Water Treatment Plant at Fremont Lake to the west side of the Town. The project included new electrical services, eletrical distribution, lighting, telemetry, scada controls, electric valves, magnetic flow meters, PLC installation and programming, and electric HVAC units.
General Contractor: Knife River
Project Location: Pinedale, WY
The West Transmission Line project extended the water lines coming from the Water Treatment Plant at Fremont Lake to the west side of the Town. The project included new electrical services, eletrical distribution, lighting, telemetry, scada controls, electric valves, magnetic flow meters, PLC installation and programming, and electric HVAC units.
Jackson & Truman Lighting Replacements
Owner: Sweetwater County School District #2
General Contractor: Mountain West Electrical Services, LLC
Project Location: Green River, WY
The Jackson & Truman Lighting project consisted of upgrading existing lighting systems in the two building to newer, more efficient lighting products. The existing T12 and T8 type lighting fixtures were replaced with new T5 high output type fixtures and new lighting layouts to produce more lumens with less fixtures.
General Contractor: Mountain West Electrical Services, LLC
Project Location: Green River, WY
The Jackson & Truman Lighting project consisted of upgrading existing lighting systems in the two building to newer, more efficient lighting products. The existing T12 and T8 type lighting fixtures were replaced with new T5 high output type fixtures and new lighting layouts to produce more lumens with less fixtures.